Typical timelines
| Who builds it | Usual timeline | What usually slows it down |
|---|---|---|
| You, on a website builder | A weekend to a few weeks | Writing every page and finding photos yourself |
| A freelancer | A few weeks to a couple of months | Back-and-forth on content and changes |
| An agency | One 2026 guide puts U.S. agencies at 8 to 20 weeks (FactoryJet) | More people, more meetings, more approvals |
These are timelines to launch day. Two other clocks run beside them, and no designer controls either one: Google finding your new pages, and Google verifying your Business Profile if it isn’t verified yet. Both are covered below.
What really takes the time
- Figuring out what to say. Which services, which towns, what makes you different.
- Writing the words. Most owners would rather do anything else.
- Gathering photos. Real job photos beat stock photos, but someone has to find them.
- Decisions and changes. Every round of “can we move this” adds days.
- Logins and access. Your domain, your Google Business Profile, your old site. If the person who set them up has moved on, finding the logins can take longer than the build.
None of these is code. That’s why two projects of the same size can take two weeks or three months.
An example: a plumbing company’s site, step by step
Here’s how the work usually adds up, using a made-up plumbing company that does drain cleaning, water heaters, repiping, leak repair, sewer lines and remodels, in six towns.
- The page list. Six services and six towns means twelve pages, plus home, about, reviews and contact. If you can name your services and towns in ten minutes, this step is quick. If three partners have to agree, it can take a week.
- The words. Sixteen pages is a lot of writing. Each service page has to answer what a customer asks on the phone: what it is, roughly what’s involved, which towns, how to book. This is where most projects stall.
- The photos. Ten to thirty real job photos is plenty. They’re usually already on your phone. Finding them is an evening, not a month.
- Review rounds. One careful pass on your phone, then one round of fixes. Each extra round adds days.
- Launch. The domain is pointed at the new site, and old page addresses are sent to the new ones so nobody lands on a dead page.
The same steps apply to a roofer, an HVAC company, a cleaner or a restaurant. A restaurant swaps town pages for a menu and maybe online ordering. A cleaner may want online booking. The work is in the content, not the code.
What happens after launch day
Live is not the same as found. Google has to crawl your new pages, and Google says crawling “can take anywhere from a few days to a few weeks”, and that asking for a crawl doesn’t guarantee your pages show up quickly, or at all (Google Search Central).
If your new site replaces an old one, the old page addresses need permanent redirects to the new ones. Google recommends keeping those redirects “generally at least 1 year”, and says a small to medium-sized site can take a few weeks for most pages to move over in its results (Google Search Central). Skip the redirects and the links customers saved, and the ones in your old Google listings, lead nowhere.
Edge cases that add time
- Your Google Business Profile isn’t verified. After you finish the steps, Google’s review can take up to 5 business days, and a postcard code usually arrives within 14 days. Google also says not to edit your name, address or category while you wait (Google Business Profile Help). More on this in how to get on Google Maps.
- Your old web designer holds your domain. Getting it moved into your name takes their cooperation and some back-and-forth with the registrar. See who owns your website and domain.
- Proof that needs checking. Licenses, insurance and manufacturer certifications should be confirmed before they go on the site. If it can’t be backed up, leave it off.
- Online payments or bookings. Deposits, bill pay or online orders need your own payment account set up first, which takes your time, not just ours.
- A busy season. A roofer after a hailstorm or an HVAC company in July has little time to review anything. If you can, start before your rush, not during it.
Common mistakes that stall a website
- Waiting for perfect photos. Phone photos of real jobs work. Start with what you have.
- Rewriting everything at the last review. Big changes belong at the start, when the plan is made.
- Too many people approving. Pick one person who gives the final yes.
- Adding pages before launch. New ideas are easier to add once the site is live.
- Forgetting the old links. Launching without redirects throws away what the old site had built up.
How to speed up any website project
- Gather your phone photos of real jobs before you start.
- List every service you want customers to call you for, and every town you serve.
- Decide who on your side gives the final yes, so changes don’t stall.
- Find your domain and Google Business Profile logins before you need them.
- Keep the first version simple, and add to it once it’s live.
Tip: don’t wait for perfect photos. Real phone photos of real jobs beat stock pictures every time.
How we do it, and why it’s fast
We flip the order. We research your business first, from your existing site, your Google Business Profile, your reviews and your social posts. Then we write the plan and build your whole new site before you’ve paid anything. You usually see it working, on your phone, within about 48 hours of applying. If you like it, it’s live about a week after you say yes. After that it’s your photos, your proof and your review.
That week looks like this. We email within a business day to set a 20-minute kickoff. You send 10 to 30 job photos, the proof you can back up, and access to your domain and Google Business Profile, or we register the domain in your name. We put it all in, you tap through a private preview link on your phone, and we fix what you flag. Then it goes live on your domain, old links are redirected, Google is pointed at the new site, and we watch it closely for the first 48 hours. You get the research and written plan behind it too.
Wondering what it costs, not just how long it takes? See what a website costs in Utah County.
Have these ready to go faster
0 / 5
Tap to tick. Your ticks stay on this device.